Sunday, June 27, 2010

Siding and the Exterior

While some work has been going on inside there has also been some work going on outside. The guys are tar papering the outside of the house in preparation for the siding to be added. The top level of the house is going to be a dark grey and the bottom floors a lighter grey. Here is some of the siding, with one topcoat, ready to be added.

The floor pouring has been postponed while we wait for some electrical work to be done.





No comments:

Post a Comment